I love that all these orders are moving along now… Maybe my 6 month old order will be done by the end of the year.
What about all customer sold Rams, they shouldn't neglect customers that placed orders 6 months ago.They aren't building any. Only built 400something so far in '26. 9 a day? Besides us, the demand for the RHO has been tepid at best. Hemi demand, on the other hand ... 10,000+ orders within the 1st 24 hours of it becoming available. Easy decision on what to build for Ram.
I called multiple times for the second order, after being pushed and still in D1 statusLooks like all I had to do to get my truck started was sign up and complain online and less than 24hrs later it’s in production!
I called multiple times for the second order, after being pushed and still in D1 status
Same. ordered march 12, pushed to 26MY in June. No update on my order other than built by 09/09. Rams build process makes no senseI love that all these orders are moving along now… Maybe my 6 month old order will be done by the end of the year.
Lucky you, my truck has the exact same date for confirmation and scheduling. I previously ordered the truck level 1 in mid march and it got put into d1 but stayed there until the truck was pushed to 2026. My dealership was absolutely useless and only had one response to my questions. “We don’t have any say in production. Once it goes in production, we can rush shipping but just keep waiting”. Tbh idk if waiting more is worth it. There are many rhos at dealerships and in my dealership, they gave me absolutely no rebates. They gave me 1500 off but that’s it.Looks like all I had to do to get my truck started was sign up and complain online and less than 24hrs later it’s in production!
I saw the same article, but it's misleading honestly, it is a great headline though!They aren't building any. Only built 400something so far in '26. 9 a day? Besides us, the demand for the RHO has been tepid at best. Hemi demand, on the other hand ... 10,000+ orders within the 1st 24 hours of it becoming available. Easy decision on what to build for Ram.
Hope mine next to yours on that line.I was told by Anthony yesterday that they had 18 RHO’s go into production the past week.
The numbers change daily, but I believe I had found 1,545 Hemi stickers at last count. All Bighorns.@Eighty may be able to pull better charts
Yes. Might even be a little aggressive. Once it leaves the factory floor, it goes to the body vendor. Then it needs to pass inspection. Then it goes onto a transport to the rail yard. Then it waits for the right train. There may be a transfer somewhere along the way to another train. When it finally gets to your city, it gets unloaded and has to wait for a transport to take it to the dealership. At any of those transfer points, there could be a couple of days (or in extreme cases, weeks) where it just sits waiting for someone to move it.Tracker updated midnight today:
In Production: Sep 7
Estimated Delivery: Nov 2
Is this normal time frame?
Thanks for the info! I noticed an earlier post in the thread (just a few messages above) with a similar In Production date (Sep 4), but the Estimated Delivery is way earlier (Oct 13). Not sure why there is such a big difference...Yes. Might even be a little aggressive. Once it leaves the factory floor, it goes to the body vendor. Then it needs to pass inspection. Then it goes onto a transport to the rail yard. Then it waits for the right train. There may be a transfer somewhere along the way to another train. When it finally gets to your city, it gets unloaded and has to wait for a transport to take it to the dealership. At any of those transfer points, there could be a couple of days (or in extreme cases, weeks) where it just sits waiting for someone to move it.
How long does it typically take to go from In Production to built?Yes. Might even be a little aggressive. Once it leaves the factory floor, it goes to the body vendor. Then it needs to pass inspection. Then it goes onto a transport to the rail yard. Then it waits for the right train. There may be a transfer somewhere along the way to another train. When it finally gets to your city, it gets unloaded and has to wait for a transport to take it to the dealership. At any of those transfer points, there could be a couple of days (or in extreme cases, weeks) where it just sits waiting for someone to move it.
If you’re referring to my order, my dealer is in the Chicago suburbs and just 20 minute drive from the rail yard they ship in and out of and could be a factor. Just speculation thoughThanks for the info! I noticed an earlier post in the thread (just a few messages above) with a similar In Production date (Sep 4), but the Estimated Delivery is way earlier (Oct 13). Not sure why there is such a big difference...
Trucks are generally assembled fully in one day from start to finish (maybe splitting across two calendar days, depending on the shift). The "estimated ship date" is the estimated build date.How long does it typically take to go from In Production to built?
Only the Ram gods know, lol. Could be about the scheduled timing for a particular train. Perhaps the next few heading your direction are already booked up.Thanks for the info! I noticed an earlier post in the thread (just a few messages above) with a similar In Production date (Sep 4), but the Estimated Delivery is way earlier (Oct 13). Not sure why there is such a big difference...